Thursday, January 22, 2009

Sheetrock :-)

We were worried on the way to the house that we would be locked out of our house, but luckily the front door was still open. And when we walked in, we saw sheetrock!!!!!! All the insulation is done, and the sheetrock is about 75% finished. Some of the walls still did not have it, and most of the house still had seams and screws showing. Here is the kitchen:
The back wall of the living room with the fireplace.The tall wall in the living room.
They have done the spackle on most of the rooms upstairs. This is the guest bedroom.
The garage is all done, too.
Our back stairs are in!!! And covered in icicles.
Here is out meter box from the last post.
While we were there, the furnace kicked on twice, so we know it's working! And it was so warm in the house, we are excited. Drafts from the windows are things we would like to leave at the apartment :-P
We were there around 4:30, and there was still so much light in the house!!! It will be nice to enjoy daylight, rather than having it be pitch black at 4:00 at the apartment.
Keep your fingers crossed for us that they keep speeding along, and our closing date moves up!

Saturday, January 17, 2009

Newest Developments

They finally came and finished the siding!!!!!!! Yay, the house doesn't look half naked anymore :-P The only thing left to make it look complete cosmetically is painting the front door. Obviously, the lights and water sources for the outside are not there yet, either.
The electrician was here! Phone lines, cable lines, electricity! Only one outlet actually had a face; it was one in the kitchen, we're assuming that they are using this outlet for their work, seeing that our house actually has power now. This photo is the upstairs bedroom.
Pretty wires; haha.
All the wires have to go somewhere...so here they are. I thought this was kind of amusing, this massive amount of wires coming from the ceiling. The hot water heater also got installed.
The official word saying that gas can be connected to our house!!! Woohoo!!!
Their next step is insulation; it was on the work calendar for Friday, but they obviously didn't get to it. That's fine, we are happy with what they did. Except for the fact that we may be missing two phone lines, all is well.

Sunday, January 11, 2009

So much done!!!

We got news on Thursday that they discontinued the color of tile we had chosen for our bathroom, so yesterday we headed back to the model house to re-pick a tile color. When we pulled up in front of our house, we saw that the siding still was not done, which annoyed us. But when we went inside, our annoyance soon disappeared. So much was done!!! They put our showers in their correct locations. Here is Ben rinsing his hair in our master bathroom :-P
They put in the pipes and the heating ducts/vents. It was pretty against the wood haha
They had poured the garage and basement floors last week, but we weren't able to get a picture. Well, here is the garage floor:
Our stairs were in!! We were able to go upstairs and downstairs for the first time! They are covered with cardboard which is adhered with this nice blue tape:
On to the basement; both our furnace and our electric box are in. The rough plumbing for the full bath that we will eventually have down there is in, as well. Below is the furnace:
They also poured our front steps:

We bought all the light fixtures we need, and ordered our ceiling fan and accessories. The work order for this week included finishing the plumbing, the eletrical guy coming for a few days, an inspection on Thursday, and insulation beginning on Friday. We will see how much gets done. And if the siding guys come back to finish that little bit of house!!

Saturday, January 3, 2009

Mystery Solved

We had to go sign a change order today, so we went by the house- still not sided. The sales director was there, so we asked when it was expected to be done. He said "Well the window had to be fixed first", which we obviously followed up with "um....what was wrong with the window?" Turns out, when they cut the windows out while they were framing, they set the large window over the front door about a foot too high. We don't know how they figured out it was incorrect, but they had to remove the window, re-cut, put the window back in, and seal the hole.
Ben and I had never noticed. But if you go back and look at the pictures of the framing, the top of the window was very close to the roof. Looking at the picture I posted yesterday, you can see where they lowered it.
Crazy, right? Siding should be finished early this coming week.

Friday, January 2, 2009

Not much new news...

We were so excited that they started to side the house...now it has come to a hault. It's looked like this for the past week, they only have that little bit to side. The siding is now covered in snow next to the garage. We are hoping that it gets finished soon!

Other than that, they poured both the garage floor and the basement floor. The next door neighbor (who seemed very nice) was out when we went yesterday (Thursday) and she told us that she saw the cement mixer at the house on Tuesday. The garage was boarded up and both the front and back doors were nailed shut, so we couldnt get in to see it. We did, however, peak through the garage window haha.

We hope everyone had a good holiday season. Happy New Year!

Saturday, December 20, 2008

It's Ex-siding!! (Get it? Exciting!)

Today we went to pick out appliances and get a more final idea of the tile/carpet/granite colors. When we pulled around the circle, we found 3 men putting siding up!!! In the snow!! We couldn't believe they were actually working on a Saturday in the snow, but there they were. They had half the back done and this much of the side when we were there. 3 hours later we drove by again on our way home; they had finished this side and had half of the other side done. Yay!!

Even though there were workers there, we decided to go inside. After walking up a thin metal plank into our mudroom, we were in. This is the landing for the stairs going up to the office. Part of our stairs got delivered, as well, but it was the short portions that come after the landing. So I'm not including a picture of those because it's only 2 steps!
This is Ben at what will be our breakfast bar. He looks a little hungry- Want some pancakes?
The workers have the windows open while they are there. As a matter of fact, the one doing the siding on the side of the house was climbing in and out of our upstairs window. haha! So, like I said it was snowing today....so here is some accumulation in our master bedroom and closet.
Best part of all- our fireplace was sitting there!!! That's its home and there it is all covered up! It will certainly be nice to have next year on a day like this!!!
We are very happy with the progress so far! Maybe we will be moving before the tentative date we have, keep your fingers crossed!!! All of the colors have been chosen, we will make sure they go together one more time before we hand in the order for good.
Happy Holidays everyone!!!!!!!!

Tuesday, December 16, 2008

A roof over our heads

I went Christmas shopping in Enfield today, so on the way home I went by the house. I'm glad I did!! When I got there, they were finishing up the roof! The roofer was finishing up the extension on our bedroom and the fireplace. Seeing that it's supposed to be bad weather tomorrow and Friday, we're glad they got it done and I'm sure they are too. They also installed all the windows and the doors! Now the wind won't blow through when we are inside anymore :-P
Please excuse the poorer than normal quality of the pictures, all I had with me was my cell phone camera.
They also put the trim around the garage doors.
The man on the roof was looking at me like I was crazy as I was taking pictures. I was thinking that the second guy drinking coffee in his utility van should have been doing work :-P