Sunday, February 8, 2009

Things are moving right along!!

We are officially locked out of the house. Now when we want to go in, we have to go ask the nice lady that sits in the model home to come let us in. We drive over and she opens the door and then leaves. Annoying, but well worth it....we found cabinets when we walked in!!!

This is our kitchen, slowly beginning to actually look like a kitchen!! I am in love with the huge lazy susan in the corner. The cabinets are missing their hardware for right now, but they look fabulous just the same!!
The vanity in the master bathroom, with dual sinks. Cannot wait for my own sink!!
The office. They put up the railings on the staircases and started putting up the railings along the office/reading room space. Soon I won't have to worry about falling off hahaha
All of our windows have sills. Even the ones that are at the top of the tall ceilings. Ben told me "have fun dusting those". Yeah, we are going to have to get a long stick with a rag on the end or something of the sort.
The thermostats are in! We thought the upstairs one was in a pretty random location, inside the second bedroom. We would have preferred it in the hallway, but we will deal with it.
They installed our central air!!!! Though we now have to live with this huge pile of rocks on the side of our house, we will have awesome AC this summer.
I thought this was funny and had to share...the house builders' version of the beach....kicking back in our living room by the fireplace :-P
Here is our incredibly messy house as of right now. Maybe this is why they lock people out, so they don't see the piles of sawdust and wood all over the place!
1 month and 2 days left.

Thursday, February 5, 2009

New updates

I realized I hadn't updated this is a while, so this is an entry of two different visits to the house. Last time we were there (1/31), they had finished the mudding through the whole house. This is a view from what will be my reading room to the front of the house.
This is a view from the same room, but of the back wall of the house. To the left is the office, looking down is the living room.
The ducts in the basement. When we saw the water under the window, we panicked and called the sales director. After an inspection from both him and the building director, Bob, it turns out it was just condensation. The heat is on in the house, but the basement is really cold, thus creating some moisture on the walls.
This is our kitchen and part of our dining room. Look how bright it is in there!!!!! The hole for the medicine cabinet in our bathroom.
We got the closing date on the house, now we just have to wait for it to get here!! We are so excited and can't wait to move in!!

Thursday, January 22, 2009

Sheetrock :-)

We were worried on the way to the house that we would be locked out of our house, but luckily the front door was still open. And when we walked in, we saw sheetrock!!!!!! All the insulation is done, and the sheetrock is about 75% finished. Some of the walls still did not have it, and most of the house still had seams and screws showing. Here is the kitchen:
The back wall of the living room with the fireplace.The tall wall in the living room.
They have done the spackle on most of the rooms upstairs. This is the guest bedroom.
The garage is all done, too.
Our back stairs are in!!! And covered in icicles.
Here is out meter box from the last post.
While we were there, the furnace kicked on twice, so we know it's working! And it was so warm in the house, we are excited. Drafts from the windows are things we would like to leave at the apartment :-P
We were there around 4:30, and there was still so much light in the house!!! It will be nice to enjoy daylight, rather than having it be pitch black at 4:00 at the apartment.
Keep your fingers crossed for us that they keep speeding along, and our closing date moves up!

Saturday, January 17, 2009

Newest Developments

They finally came and finished the siding!!!!!!! Yay, the house doesn't look half naked anymore :-P The only thing left to make it look complete cosmetically is painting the front door. Obviously, the lights and water sources for the outside are not there yet, either.
The electrician was here! Phone lines, cable lines, electricity! Only one outlet actually had a face; it was one in the kitchen, we're assuming that they are using this outlet for their work, seeing that our house actually has power now. This photo is the upstairs bedroom.
Pretty wires; haha.
All the wires have to go somewhere...so here they are. I thought this was kind of amusing, this massive amount of wires coming from the ceiling. The hot water heater also got installed.
The official word saying that gas can be connected to our house!!! Woohoo!!!
Their next step is insulation; it was on the work calendar for Friday, but they obviously didn't get to it. That's fine, we are happy with what they did. Except for the fact that we may be missing two phone lines, all is well.

Sunday, January 11, 2009

So much done!!!

We got news on Thursday that they discontinued the color of tile we had chosen for our bathroom, so yesterday we headed back to the model house to re-pick a tile color. When we pulled up in front of our house, we saw that the siding still was not done, which annoyed us. But when we went inside, our annoyance soon disappeared. So much was done!!! They put our showers in their correct locations. Here is Ben rinsing his hair in our master bathroom :-P
They put in the pipes and the heating ducts/vents. It was pretty against the wood haha
They had poured the garage and basement floors last week, but we weren't able to get a picture. Well, here is the garage floor:
Our stairs were in!! We were able to go upstairs and downstairs for the first time! They are covered with cardboard which is adhered with this nice blue tape:
On to the basement; both our furnace and our electric box are in. The rough plumbing for the full bath that we will eventually have down there is in, as well. Below is the furnace:
They also poured our front steps:

We bought all the light fixtures we need, and ordered our ceiling fan and accessories. The work order for this week included finishing the plumbing, the eletrical guy coming for a few days, an inspection on Thursday, and insulation beginning on Friday. We will see how much gets done. And if the siding guys come back to finish that little bit of house!!

Saturday, January 3, 2009

Mystery Solved

We had to go sign a change order today, so we went by the house- still not sided. The sales director was there, so we asked when it was expected to be done. He said "Well the window had to be fixed first", which we obviously followed up with "um....what was wrong with the window?" Turns out, when they cut the windows out while they were framing, they set the large window over the front door about a foot too high. We don't know how they figured out it was incorrect, but they had to remove the window, re-cut, put the window back in, and seal the hole.
Ben and I had never noticed. But if you go back and look at the pictures of the framing, the top of the window was very close to the roof. Looking at the picture I posted yesterday, you can see where they lowered it.
Crazy, right? Siding should be finished early this coming week.

Friday, January 2, 2009

Not much new news...

We were so excited that they started to side the house...now it has come to a hault. It's looked like this for the past week, they only have that little bit to side. The siding is now covered in snow next to the garage. We are hoping that it gets finished soon!

Other than that, they poured both the garage floor and the basement floor. The next door neighbor (who seemed very nice) was out when we went yesterday (Thursday) and she told us that she saw the cement mixer at the house on Tuesday. The garage was boarded up and both the front and back doors were nailed shut, so we couldnt get in to see it. We did, however, peak through the garage window haha.

We hope everyone had a good holiday season. Happy New Year!