This is our kitchen, slowly beginning to actually look like a kitchen!! I am in love with the huge lazy susan in the corner. The cabinets are missing their hardware for right now, but they look fabulous just the same!!
The vanity in the master bathroom, with dual sinks. Cannot wait for my own sink!!
The office. They put up the railings on the staircases and started putting up the railings along the office/reading room space. Soon I won't have to worry about falling off hahaha
All of our windows have sills. Even the ones that are at the top of the tall ceilings. Ben told me "have fun dusting those". Yeah, we are going to have to get a long stick with a rag on the end or something of the sort.

They installed our central air!!!! Though we now have to live with this huge pile of rocks on the side of our house, we will have awesome AC this summer.

1 month and 2 days left.

The thermostats are in! We thought the upstairs one was in a pretty random location, inside the second bedroom. We would have preferred it in the hallway, but we will deal with it.
They installed our central air!!!! Though we now have to live with this huge pile of rocks on the side of our house, we will have awesome AC this summer.
I thought this was funny and had to share...the house builders' version of the beach....kicking back in our living room by the fireplace :-P
Here is our incredibly messy house as of right now. Maybe this is why they lock people out, so they don't see the piles of sawdust and wood all over the place!
1 month and 2 days left. 



We got the closing date on the house, now we just have to wait for it to get here!! We are so excited and can't wait to move in!!
The tall wall in the living room.









Their next step is insulation; it was on the work calendar for Friday, but they obviously didn't get to it. That's fine, we are happy with what they did. Except for the fact that we may be missing two phone lines, all is well.




